Dscaff SBS Wall System Dscaff SBS Plastic Formwork
The polypropylene panel does not require any formwork release oil to be applied as concrete will not stick to this material, The panel is easily removed once the concrete is cured. This also further reduces labour costs and site pollution. There is no longer any need to drill holes into the formwork as the panels are pre fitted with multiple tie opening points which take into account a range of concrete pressures and pour rates. A purpose made filler plug is secured to the remaining tie holes openings which are not in use.
Wall & Column
Formwork
Plastic -PVC
NA
| Feature | Performance |
|---|---|
| Chemical resistant | Yes |
| Durability | Yes |
| Easy installation | Yes |
| Environmental friendly | Yes |
| Termite resistant | Yes |
| Lightweight | Yes |
| Maintenance Free | Yes |
| Reusable / Recyclable | Yes |
| Rust-Free | Yes |
| Waterproof | Yes |
| Wear and Tear resistant | Yes |
| Specification | Properties |
|---|---|
| Dimension (L x W x H) | 300mm Panels / 11” 13/16 a) Length: 1200mm x 300mm 47” 1/4 x 11” 13/16 Weight: 7.96 kg / 17.55 Ibs Part no: SBS-12030 b) Length: 900mm x 300mm 35” 7/16 x 11” 13/16 Weight: 5.98 kg / 13.18 Ibs Part no: SBS-0930 c) Length: 600mm x 300mm 23” 5/8 x 11” 13/16 Part no: SBS-0630 |
| Weight | 300mm Panels / 11” 13/16 a) Length: 1200mm x 300mm Weight: 7.96 kg / 17.55 Ibs b) Length: 900mm x 300mm Weight: 5.98 kg / 13.18 Ibs c) Length: 600mm x 300mm Weight: 4.03 kg / 8.88 Ibs |
NA
NA
NA
| Company | Installation | Minimum Order | Cover area |
|---|---|---|---|
| No Result found. | |||
No Photo & Brochure available